| • |
No inground channel required |
|
| • |
In most cases no additional site preparation required |
| • |
Reduced site costs (no thickening of slab and extra steel required) |
| • |
Glass installed at end of job reducing chances of any damage to glass |
| • |
Allows for water flow under the glass |
| • |
Grouting and expansion joints not required as for inground glass |
| • |
Can be installed from one side; reducing the need to scaffold |
| • |
Could be started and finished in one to two days depending on size of job |
| • |
Allows tiling to be completely finished prior to installation |
| • |
The clamps are adjustable to allow for fitting top rail in required |
| • |
All fittings are made from corrosion resistant 316 stainless steel |
| • |
Gates can be hung directly on the glass (no posts required) |
|
| • |
Clamps are fully adjustable to allow for variations in glass sizes |
| • |
Can be used on sloping sites with optional sloping attachment |
| • |
Can be adapted for top and side fixing on decks etc |