| • |
In most cases no additional site preparation required. |
| • |
Glass is installed at end of job, reducing the chances of any damage to glass
|
| • |
Allows for water flow under the glass, for easier cleaning |
| • |
Tiling can be completely finished prior to installation |
| • |
All stainless fittings are 316 marine grade |
| • |
Gates can be hung using full height posts |
| • |
Can be used on sloping sites |
| • |
Can be adapted for top and bottom side fixings on decks, etc. |